Recent Updates

1.  Addendum #1 (and additional bid documents) for the WVWCD Quail Creek Water Treatment Plant 90 MGD Expansion and Ozone Addition Phase 3 is now available at the following link:

\Current Bids\QCWTP

Please note that the Volume 5 and Volume 6 drawings are each split into eight separate parts (sixteen files total for both Volumes).

A required pre-bid walkthrough was completed April 16, 2026 at 10:00AM.  Bids are due May 21, 2026 at 1:00PM local time.  Bid opening is the next day at May 22, 2026 at 10:00AM.